Maudach Waterworks TWB II Waterworks II








Projektinformationen
On behalf of Technische Werke Ludwigshafen (TWL), the refurbishment of a 6,000 m³ drinking water reservoir was carried out between September 2024 and October 2025. The works included surface preparation using high-pressure water jetting, followed by the installation of precast concrete jackets (Ø 60 cm) around 16 asbestos-contaminated columns (Ø 30 cm) with a finished surface. In addition, the ceiling (1,320 m²), walls (530 m²) and floor (2,050 m²) were coated with a purely mineral, microsilica-modified sprayed mortar. The project also included the replacement of the access door, the DN 700 inlet, DN 900 outlet, DN 100 drain and the DN 300 overflow system.
Client
Technische Werke Ludwigshafen (TWL)
Project size
6.000 m³
Execution Period
September 2024 – October 2025
Scope of Work/ Project Description
- Surface preparation using high-pressure water jetting
- Installation of precast concrete jackets (Ø 60 cm) around 16 asbestos-contaminated columns (Ø 30 cm) with a finished surface
- Application of a purely mineral, microsilica-modified sprayed mortar coating to the ceiling (1,320 m²), walls (530 m²) and floor (2,050 m²)
- Replacement of the access door, DN 700 inlet, DN 900 outlet, DN 100 drain and DN 300 overflow system