Project Information

On behalf of Hardwasser AG, the renovation of the Central West reservoir, which comprises two water chambers with a usable capacity of 3,000 m³ each, was carried out between June 2016 and August 2018. The scope of services included extensive protective measures, substrate preparation using solid blasting and the renovation of damaged areas. A new mineral coating was applied to an area of 6,500 m², supplemented by the production of 530 m of edge formwork, corrosion protection work on the pipelines and final cleaning and disinfection. A special feature of the project was the structure with main and reaction chambers and the professional demolition of asbestos-contaminated materials in accordance with TRGS 519.

Client
Hardwasser AG

Project size
Two water chambers, each with a usable capacity of 3,000 m³

Execution
June 2016 – August 2018

Scope of services/project description

  • Protective measures
  • Damage repair
  • Substrate preparation
  • Solid blasting
  • 530 m edge formwork
  • 6,500 m² mineral coating
  • Corrosion protection
  • Piping
  • Cleaning/disinfection

 

Special feature

Structure with main chamber and reaction chambers