On behalf of Stadtwerke Pirmasens, the Horeb drinking water reservoir, which has two water chambers each with a capacity of 5,000 m³, was renovated between August 2015 and December 2016. The scope of work included concrete repair over an area of 6,100 m², starting with substrate preparation using HDW blasting and PCB remediation. In addition, crack grouting was carried out, the old coating was removed and a completely new coating was applied using a mineral system, including the lining of the chambers with sprayed mortar. The disposal of 600 tonnes of hazardous waste posed a particular challenge, which was overcome while operations continued.

Client
Pirmasens Municipal Utilities

Project size
Two water chambers per 5,000 m²

Execution
August 2015 – December 2016

Scope of services/project description
6,100 m² concrete repair:

  • Substrate preparation (HDW blasting)
  • PCB remediation
  • Crack injection
    Lining of water chambers with sprayed mortar
  • Removal of old coating, complete recoating with mineral system

 

Special feature
Disposal of 600 tonnes of hazardous waste during ongoing operations