Repair of the BAB A60 Mainz-Finthen bridge






Project information
On behalf of the State Mobility Agency Montabaur (LBM), the bridge on the A60 motorway in Mainz-Finthen was repaired between June 2015 and July 2016 at a project cost of approximately €1.5 million. The extensive work included traffic safety measures, demolition of the caps, road surface, and safety equipment. This was followed by the construction of new caps, including sealing, various road construction works, and concrete repairs to the bridge soffits. A special feature of the project was the parallel concreting of two bridges and the professional demolition of asbestos-contaminated materials in accordance with TRGS 519.
Client
State Mobility Agency, Montabaur Motorway Authority (LBM)
Project size
Approx. 1.5 million euros
Implementation
June 2015 – July 2016
Scope of services/project description
- Traffic safety
- Demolition of caps
- Road surface and safety equipment
- New construction of caps and sealing
- Road construction
- Concrete repair of bridge soffits
special features
- Two bridges to be concreted in parallel
- Demolition of asbestos-contaminated materials (TRGS 519)