Premier Inn Hotel, Wiesbaden






Project Information
On behalf of Wolff Hoch- und Ingenieurbau GmbH & Co. KG, a construction project with a clinker surface area of approximately 2,400 m² was carried out between 2021 and 2022. The scope of services included the installation of a composite thermal insulation system (ETICS) with subsequent clinker brick cladding, with the corners of the building being rounded as a special design feature.
Client
Wolff Construction and Engineering Ltd. & Co.KG
Project size
Approx. 2,400 m² of clinker surface area
Execution
2021 – 2022
Scope of services/project description
- External thermal insulation composite system, with brick cladding
Special Features
House corners rounded





