Premier Inn Hotel, Wiesbaden

Project Information

On behalf of Wolff Hoch- und Ingenieurbau GmbH & Co. KG, a construction project with a clinker surface area of approximately 2,400 m² was carried out between 2021 and 2022. The scope of services included the installation of a composite thermal insulation system (ETICS) with subsequent clinker brick cladding, with the corners of the building being rounded as a special design feature.

Client

Wolff Construction and Engineering Ltd. & Co.KG

Project size
Approx. 2,400 m² of clinker surface area

Execution

2021 – 2022

Scope of services/project description

  • External thermal insulation composite system, with brick cladding

 

Special Features

House corners rounded