Sidewalk renovation on Theodor-Heuss-Bridge, Wiesbaden, Germany

Project information

On behalf of the Wiesbaden Civil Engineering Office, the sidewalk renovation on the Theodor Heuss Bridge was carried out from July to September 2023. The project covered an area of approximately 1,900 m², where the old pavement was first removed before the sidewalk was recoated with a thin RHD coating. A special feature of this project was the optimized construction process, which enabled a particularly short construction period.

Client
Wiesbaden Civil Engineering Office

Project size
Approx. 1,900 m²

Implementation
July – September 2023

Scope of services/project description
Removal and recoating of the sidewalk with RHD thin coating

Special features
Optimized construction process thanks to short construction time