Striking residential building Rennwegdreieck, Freiburg





Project information
Between May and November 2022, we carried out a comprehensive renovation of a circular water chamber with a capacity of 1,500 m³ for Stadtwerke Bad Nauheim GmbH. The work began with the removal of 800 m² of wall, column, and floor tiles, followed by the preparation of the substrate over a total area of 1,140 m². This was followed by the application of a new cement-bound coating to the interior surfaces, with 345 m² of ceiling space finished in white, 440 m² of wall and column surfaces in blue, and 345 m² of floor space in gray, all professionally executed.
Client
Freiburg City Planning Department
Project size
- Installation of 700 m³ of insulation materials (plus over 85 tons of plaster, adhesive, and joint mortar)
- 250,000 clinker bricks
Implementation
June 2020 – April 2021
Scope of services/project description
Over 700 prefabricated parts were assembled using three different construction methods.
The retaining brackets for the prefabricated parts can bear a load of 4,440 tons and are earthquake-proof. 4.5 km of permanently elastic joints were installed.
Technical challenge:
- Symmetry of the building with sophisticated angles and system transitions
- Compliance with manufacturing tolerances (>1 cm) in accordance with building reference points
- Transport and installation of prefabricated parts weighing up to 150 kg at a height of over 20 m and over 100 m around the building
- Accuracy of angles and system connections for three different prefabricated models
Technical challenge:
- Manufacture of driving rain and windproof system closures ETICS facade to prefabricated parts and prefabricated parts to window elements
- Measurement of prefabricated parts to suit the conditions of the building
- Determination and adherence to fixed points and interfaces for a harmonious appearance of the building’s symmetry
special feature
The area treated was equivalent to the size of 13 tennis courts.





