Spindel Werk P, Melsungen, Germany

Project information

On behalf of B. Braun, the spindles at Plant P in Melsungen were repaired between summer 2021 and summer 2022. The project included OS 10 coating of the roadway and curbs over a total area of 2,800 m². Up to seven work steps were carried out before the final head sealing, and detailed sealing with a flow-in insert was carried out over a total gutter length of 1,000 m. The work posed a particular challenge due to changeable and difficult weather conditions such as rain, frost, and strong sunlight.

Client
B. Braun

Project size
2,800 m²2 Coating

Implementation
Summer 2021 – Summer 2022

Scope of services/project description
OS 10 Coating of the roadway and curbs in the spindles of the parking deck

Special features

  • Up to seven work steps until the head is sealed
  • Detailed sealing with flow-in insert over a total gutter length of 1,000 m
  • Working in difficult weather conditions (rain, frost, sun)